TABLE
OF CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Month
Future Key Issues
Purpose of the Report
Structure of the Report
Background
Project Organizations
Construction Activities undertaken during
the Reporting Month
Status of Environmental Licences,
Notification and Permits
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Methodology and QA/QC Procedure
Results and Observations
Updated Construction Noise Assessment
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Parameters and Frequency
Monitoring Methodology
Laboratory Analytical Methods
QA/QC Requirements
Decontamination Procedures
Sampling Management and Supervision
Results and Observations
Post-Translocation Coral Monitoring
Event and Action Plan
Results and Observations
Monitoring Requirement
Monitoring Locations
Monitoring Equipment
Monitoring Methodology
Alert, Alarm and Action Levels
Results
Mitigation Measures for Cultural Heritage
8. LANDSCAPE
AND VISUAL IMPACT REQUIREMENTS
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Site Audits
Implementation Status of Environmental
Mitigation Measures
12. ENVIRONMENTAL
NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and
Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
14. CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST
OF TABLES
Table I Non-compliance
Recorded for the Project in the Reporting Month
Table II Summary Table for Key Information in the
Reporting Month
Table 2.1 Key
Project Contacts
Table 2.2 Summary
Table for Major Site Activities in the Reporting Month
Table 2.4 Summary of the Status of
Environmental Licences, Notification and Permits
Table 3.1 Locations for Air
Quality Monitoring
Table 3.2 Air Quality
Monitoring Equipment
Table 3.3 Impact Dust
Monitoring Parameters, Frequency and Duration
Table 3.4 Major
Dust Source during Air Quality Monitoring
Table 4.1 Noise Monitoring
Stations
Table 4.2 Noise Monitoring
Equipment
Table 4.3 Noise Monitoring
Parameters, Frequency and Duration
Table 4.4 Major
Noise Source during Noise Monitoring
Table 4.5 Baseline Noise
Level and Noise Limit Level for Monitoring Stations
Table 5.1 Groundwater Quality Monitoring
Stations
Table 5.2 Marine
Water Quality Monitoring Stations
Table 5.3 Water Quality Monitoring Equipment
Table 5.4 Water
Quality Monitoring Parameters and Frequency
Table 5.5 Methods
for Laboratory Analysis for Water Samples
Table 5.6 Summary of
Groundwater Quality Monitoring Results
Table 6.1 Location
and Physical attributes of the Coral Recipient Site
Table 7.1 Vibration
Monitoring Equipment
Table 7.2 AAA
Levels for Monitoring for Cultural Heritage
Table 7.3 Vibration
Monitoring Results
Table 9.1 Landfill
Gas Monitoring Equipment
Table 10.1 Observations
and Recommendations of Site Audit
Table 13.1 Summary
Table for Site Activities in the next Reporting Period
LIST
OF FIGURES
Figure
1a Site Portions under Works Contract No. NE/2015/02
Figure 2 Locations of Air Quality Monitoring
Stations
Figure 3 Locations of Construction Noise
Monitoring Stations
Figure 4 Locations of Groundwater Quality
Monitoring Stations
Figure 5 Locations of Marine Water Quality
Monitoring Stations
Figure 6 Locations of Landfill Gas Monitoring
Figure 7 Location of Post-translocation
Coral Monitoring
Figure 8 Location of Monitoring for Cultural
Heritage
LIST
OF APPENDICES
Appendix
A Action and Limit
Levels
Appendix
B Copies of Calibration
Certificates
Appendix C Weather Information
Appendix
D Environmental
Monitoring Schedules
Appendix
E 1-hour TSP
Monitoring Results and Graphical Presentations
Appendix
F 24-hour TSP
Monitoring Results and Graphical Presentations
Appendix
G Noise Monitoring
Results and Graphical Presentations
Appendix I Marine Water Quality Monitoring
Results and Graphical Presentations
Appendix
J Quality
Control Reports for Laboratory Analysis
Appendix K Summary of Exceedance
Appendix M Event and Action Plans
Appendix
N Implementation
Schedule And Recommended Mitigation Measures
Appendix P Waste Generation in the
Reporting Month
Appendix
Q Tentative Construction
Programme
Appendix R Record of Landfill Gas
Monitoring by Contractor
Appendix
S Updated
Construction Noise Assessment
Appendix
T Photo record of
Post-Translocation Coral Monitoring Survey