TABLE OF CONTENTS
Environmental Monitoring Works
Key Information in the
Reporting Month
Key Construction Work in the
reporting month & the next reporting month
Construction Activities
undertaken during the Reporting Month
Status of Environmental Licences, Notification and Permits
Monitoring Parameters and
Frequency
Monitoring Methodology and QA/QC Procedure
Monitoring Parameters and Frequency
Sampling Management and Supervision
Post-Translocation Coral Monitoring
Alert, Alarm and Action Levels
Mitigation Measures for Cultural Heritage
8. LANDSCAPE AND VISUAL
IMPACT REQUIREMENTS
Monitoring Parameters and Frequency
Implementation Status of Environmental Mitigation Measures
12. ENVIRONMENTAL NON-CONFORMANCE
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and Successful Prosecution
Key Issues for the Coming Month
14. CONCLUSIONS AND
RECOMMENDATIONS
lIST
OF TABLES
Table I Non-compliance
(exceedance) Recorded for the Project in the Reporting Month
Table II Key Information in the Reporting
Month
Table III Summary Table for Complaint Details in
the Reporting Month
Table IV Summary Table for Key Construction Work
in the Reporting Month
Table V Summary Table for Site Activities in
the next Reporting Period
Table 2.1 Key Project Contacts
Table 2.2 Summary
Table for Major Site Activities in the Reporting Month
Table 2.4 Summary
of the Status of
Environmental Licences, Notification and Permits
Table 3.1 Locations for Air Quality Monitoring
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters,
Frequency and Duration
Table 3.4 Major Dust Source during Air Quality
Monitoring
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Frequency
and Duration
Table 4.4 Major Noise Source during Noise
Monitoring
Table 4.5 Baseline Noise Level and Noise Limit
Level for Monitoring Stations
Table 4.7 Baseline
Noise Level and Noise Limit Level for Monitoring Stations (Night-time)
Table 5.1 Not
Used
Table 5.2 Marine Water Quality Monitoring
Stations
Table 5.3 Water Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring Parameters and
Frequency
Table 5.5 Methods for Laboratory Analysis for
Water Samples
Table 5.6 Not
Used
Table 7.1 Cultural
Heritage Monitoring Equipment
Table 7.2 AAA
Levels for Monitoring for Cultural Heritage
Table 9.1 Landfill Gas Monitoring Equipment
Table 13.1 Summary Table for Site Activities in the
next Reporting Period
lIST OF FIGUREs
Figure
1a Site Portions under Works Contract
No. NE/2015/01 (Lam Tin Side)
Figure
1b Site Portions under Works
Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure
1c Site Portions under Works
Contract No. NE/2015/02
Figure
1d Site Portions under Works
Contract No. NE/2015/03
Figure
1e Site Portions under Works
Contract No. NE/2017/01
Figure
1f Site Portions under Works
Contract No. NE/2017/01
Figure
1g Site Portions under Works
Contract No. NE/2017/02
Figure
1h Site Portions under Works
Contract No. NE/2017/02
Figure
2 Locations of Air Quality
Monitoring Stations
Figure
3 Locations of Construction
Noise Monitoring Stations
Figure 4 Not Used
Figure
5 Locations of Marine Water
Quality Monitoring Stations
Figure
6 Locations of Landfill Gas
Monitoring
Figure
7 Location of Post-translocation
Coral Monitoring
Figure
8 Location of Monitoring for Cultural Heritage
Figure 9 Not Used
lIST OF APPENDIces
Appendix A
Action and Limit Levels
Appendix
B
Copies of Calibration Certificates
Appendix
C
Weather Information
Appendix
D
Environmental Monitoring Schedules
Appendix
E
1-hour TSP Monitoring Results
and Graphical Presentations
Appendix
F
24-hour TSP Monitoring Results
and Graphical Presentations
Appendix
G
Noise Monitoring Results and
Graphical Presentations
Appendix H Not Used
Appendix I
Marine Water
Quality Monitoring Results and Graphical Presentations
Appendix J Not Used
Appendix K
Summary of Exceedance
Appendix
L
Site Audit Summary
Appendix
M
Event and Action
Plans
Appendix N Implementation
Schedule And Recommended Mitigation Measures
Appendix O Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
Appendix
P
Waste Generation in the Reporting
Month
Appendix Q Tentative
Construction Programme
Appendix R Record of Landfill Gas Monitoring by Contractor
Appendix
S
Updated
Noise Mitigation Plan
Appendix
T
Cultural Heritage Monitoring
Results
Appendix U
Piezometer
Monitoring Results
Appendix V Updated Surface Runoff Management Plan