Environmental
Monitoring Works
Key
Information in the Reporting Month
Key
Construction Work in the reporting month & the next reporting month
Construction
Activities undertaken during the Reporting Month
Status of Environmental
Licences, Notification and Permits
Monitoring
Parameters and Frequency
Monitoring Methodology and
QA/QC Procedure
Monitoring Parameters and
Frequency
Sampling Management and
Supervision
Post-Translocation Coral
Monitoring
Alert, Alarm and Action
Levels
Mitigation Measures for Cultural Heritage
8. LANDSCAPE AND VISUAL IMPACT REQUIREMENTS
Monitoring Parameters and
Frequency
Monitoring Equipment noise
mitigation
Implementation Status of
Environmental Mitigation Measures
12. ENVIRONMENTAL NON-CONFORMANCE
Summary of Environmental
Complaint
Summary of Environmental
Summon and Successful Prosecution
Key Issues for the Coming
Month
14. CONCLUSIONS AND RECOMMENDATIONS
lIST OF TABLES
Table I Non-compliance (exceedance) Recorded for the Project in
the Reporting Month
Table II Key Information in the Reporting
Month
Table III Summary Table for Complaint Details in
the Reporting Month
Table IV Summary Table for Key Construction Work
in the Reporting Month
Table V Summary Table for Site Activities in
the next Reporting Period
Table 2.1 Key Project Contacts
Table 2.2 Summary Table for Major Site Activities
in the Reporting Month
Table 2.4 Summary of the Status of Environmental Licences, Notification and Permits
Table 3.1 Locations for Air Quality Monitoring
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters,
Frequency and Duration
Table 3.4 Major Dust Source during Air Quality Monitoring
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Frequency
and Duration
Table 4.4 Major Noise Source during Noise
Monitoring
Table 4.5 Baseline Noise Level and Noise Limit
Level for Monitoring Stations
Table 4.7 Baseline Noise Level and Noise Limit
Level for Monitoring Stations (Night-time)
Table 5.1 Not Used
Table 5.2 Marine Water Quality Monitoring
Stations
Table 5.3 Water Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring Parameters and
Frequency
Table 5.5 Methods for Laboratory Analysis for
Water Samples
Table 5.6 Not Used
Table 7.1 Cultural Heritage Monitoring Equipment
Table 7.2 AAA Levels for Monitoring for Cultural
Heritage
Table 9.1 Landfill Gas Monitoring
Equipment
Table 13.1 Summary Table for Site Activities in the
next Reporting Period
lIST OF
FIGUREs
Figure 1a Site Portions under Works Contract No.
NE/2015/01 (Lam Tin Side)
Figure 1b Site Portions under Works Contract No.
NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site Portions under Works Contract No.
NE/2015/02
Figure 1d Site Portions under Works Contract No.
NE/2015/03
Figure 1e Site Portions under Works Contract No.
NE/2017/01
Figure 1f Site Portions under Works Contract No.
NE/2017/01
Figure 1g Site Portions under Works Contract No.
NE/2017/02
Figure 1h Site Portions under Works Contract No.
NE/2017/02
Figure 2 Locations of Air Quality Monitoring
Stations
Figure 3 Locations of Construction Noise
Monitoring Stations
Figure 4 Not Used
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 6 Locations
of Landfill Gas Monitoring
Figure 7 Location
of Post-translocation Coral Monitoring
Figure 8 Location of Monitoring for Cultural Heritage
Figure 9 Not Used
lIST OF
APPENDIces
Appendix A
Action and Limit
Levels
Appendix
B
Copies of
Calibration Certificates
Appendix
C
Weather Information
Appendix
D
Environmental
Monitoring Schedules
Appendix
E
1-hour TSP
Monitoring Results and Graphical Presentations
Appendix
F
24-hour TSP
Monitoring Results and Graphical Presentations
Appendix G
Noise Monitoring
Results and Graphical Presentations
Appendix H
Not
Used
Appendix I
Marine Water
Quality Monitoring Results and Graphical Presentations
Appendix J Quality Control Reports for Laboratory Analysis
Appendix K
Summary of
Exceedance
Appendix
L
Site Audit Summary
Appendix
M
Event
and Action Plans
Appendix N
Implementation
Schedule And Recommended Mitigation Measures
Appendix O
Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
Appendix
P
Waste Generation in
the Reporting Month
Appendix
Q
Tentative
Construction Programme
Appendix
R
Record of Landfill
Gas Monitoring by Contractor
Appendix
S
Not Used
Appendix
T
Cultural
Heritage Monitoring Results
Appendix
U
Not Used
Appendix
V
Surface Runoff
Management Plan
1. This is the 60th Environmental
Monitoring and Audit (EM&A) Report prepared by Cinotech
Consultants Limited for the “Agreement No. CE 59/2015 (EP) Environmental Team
for Tseung Kwan O – Lam Tin Tunnel – Design and Construction” (hereinafter
called “the Project”). This report
documents the findings of EM&A Works conducted in October 2021.
2. During the reporting month, the
following works contracts were undertaken:
·
Contract
No. NE/2015/01 – Tseung Kwan O – Lam Tin Tunnel – Main Tunnel and Associated
Works;
·
Contract
No. NE/2015/02 – Tseung Kwan O – Lam Tin Tunnel – Road P2 and Associated Works;
· Contract No. NE/2015/03 – Tseung Kwan O – Lam
Tin Tunnel – Northern Footbridge;
· Contract No. NE/2017/01 – Tseung Kwan O – Lam
Tin Tunnel –Tseung Kwan O Interchange and Associated Works
· Contract No. NE/2017/02 – Tseung Kwan O – Lam
Tin Tunnel – Road P2/D4 and Associated Works.
· Contract No. NE/2017/06 – Tseung
Kwan O – Lam Tin Tunnel – Traffic Control and Surveillance System(TCSS)
and Associated Works
· Contract No. NE/2017/07 – Cross Bay
Link, Tseung Kwan O – Main Bridge and Associated Works.
3. Environmental monitoring for the Project
was performed in accordance with the EM&A Manual and the monitoring results
were checked and reviewed. Site Inspections/Audits were conducted once per
week. The implementation of the environmental mitigation measures, Event Action
Plans and environmental complaint handling procedures were also checked.
4. Summary of the non-compliance
(exceedance) in the reporting month for the Project is tabulated in Table I.
Table I Non-compliance (exceedance) Record for the Project in the Reporting Month
Environmental Monitoring |
No. of Non-compliance
(Exceedance) |
No. of Non-compliance (Exceedance) due to Construction Activities of this Project |
Action Taken |
||
Action Level |
Limit Level |
Action Level |
Limit Level |
||
Air
Quality |
0 |
0 |
0 |
0 |
Refer
to Appendix K |
Noise |
0 |
0 |
1 |
0 |
Refer
to Appendix K & O |
Marine
Water Quality |
26 |
164 |
0 |
0 |
Refer
to Appendix K |
Groundwater
Level Monitoring (Piezometer Monitoring) |
0 |
N/A1 |
0 |
N/A1 |
N/A |
Ecological
|
N/A |
N/A |
N/A |
N/A |
N/A |
Cultural
Heritage |
0 |
0 |
0 |
0 |
N/A |
Landfill
Gas |
0 |
0 |
0 |
0 |
N/A |
Note:(1) No Limit Level for Groundwater Level Monitoring (Piezometer
Monitoring).
Air Quality Monitoring
5. No Action/Limit Level exceedance for
1-hour TSP monitoring was recorded.
6.
No Action Level exceedance for 24-hour TSP monitoring was recorded.
7. No Limit Level exceedances for
24-hour TSP monitoring was recorded.
Construction Noise Monitoring
8. One (1) Action Level exceedance was
recorded due to documented complaints in the reporting month. The Summary of
Documented Complaints in Reporting Month is tabulated in Table III.
9. No Limit Level exceedance was
recorded due to monitoring results in this reporting month.
Water Quality Monitoring
10. Groundwater quality monitoring had been
suspended since October 2019 upon the agreement by EPD. Further
details should be founded at Section 5.1.
11. All marine water quality monitoring was
conducted as scheduled in the reporting month. There were twenty-six (26)
Action Level and one-hundred-and-sixty-four (164) Limit Level exceedances
recorded in Monitoring Stations (M) during marine water quality monitoring. During this reporting month, no sand plume
was observed during the water quality monitoring and site audits, therefore
there is no direct evidence that the recent exceedances were due to the
construction works of the Project. Details of this investigation are presented
in Section 5. Daily silt curtain
inspection and weekly diving inspection have been carried out by contractor,
the record, as reviewed by the site auditors, indicated that silt curtains were
found in good conditions.
12. Construction phase daily piezometer
monitoring by the Contractor commenced in June 2018. It has switched to monthly
basis since 3 October
2018 as the construction activity was 120m away from the piezometer gate. No
monitoring was conducted in the reporting month.
Ecological Monitoring
13. Post-translation coral monitoring
survey shall be conducted once every 3 months for a period of 12 months after
completion of coral translocation. The post-translocation coral monitoring
surveys were completed in November 2017.
Monitoring on Cultural Heritage
14. Monitoring of impacts on Cultural
Heritage at Cha Kwo Ling Tin Hau
Temple commenced in May 2017. No Alert, Alarm and Action (AAA) Level
exceedance was recorded in the reporting month.
Landscape and Visual Monitoring and
Audit
15. The implementation of landscape and
visual mitigation measures was checked during the environmental site
inspections. Recommended follow-up actions have been discharged by the
Contractor. Details of the audit findings
and implementation status are presented in Section 10.
Landfill Gas Monitoring
16. Monitoring of landfill gases
commenced in December 2016 and were
carried out by the Contractor at excavation
location, Portion III. No Limit Level exceedance was
recorded.
Environmental Site Inspection
17. Joint weekly site inspections were
conducted by representatives of the Contractor, Engineer and Environmental
Team. The representative of the IEC joined the site inspection for NE/2015/01
and NE/2017/07 on 27 October 2021 & NE/2015/02, NE/2017/01, NE/2017/02 and
NE/2017/06 on 28 October 2021 respectively. Details of the audit findings and
implementation status are presented in Section
10.
Waste Management
18. Wastes generated from this Project include inert construction and demolition (C&D) materials, non-inert C&D materials and marine sediment. Details of waste management data is presented in Section 11 and Appendix P.
19. Summary of key information in the
reporting month is tabulated in Table II
Table II Key Information in the
Reporting Month
Monthly Complaints |
Event Details |
Action Taken |
Status |
|
|
||||
Number |
Nature |
|||
October
2021 |
3 |
Noise / Odour / Water |
Details
refer to App O |
On-going
/ Draft CIRs
submitted |
September
2021 |
6*1 |
Air / Noise |
Details
refer to App O |
Closed
/ Draft CIRs submitted |
August
2021 |
3 |
Noise |
Details
refer to App O |
Closed |
July
2021 |
3 |
Noise / Working Hours |
Details
refer to App O |
Closed |
June
2021 |
3 |
Light/ Water/ Working Hours |
Details
refer to App O |
Closed |
May
2021 |
3 |
Air / Noise |
Details
refer to App O |
Closed |
April
2021 |
13*2 |
Noise |
Details
refer to App O |
Closed |
March
2021 |
18*3 |
Noise |
Details
refer to App O |
Closed |
Notifications of any summons & prosecutions
received |
0 |
--- |
N/A |
N/A |
*1: 1 complaint at September 2021 was
received at early October 2021.
*2: 1 complaint at April 2021 was received
at early May 2021.
*3: 4 new complaints in March 2021 was received by Environmental Team in April 2021.
20. Summary of complaints received in
the reporting month is tabulated in Table
III.
Table III Summary of Complaints
Details in Reporting Month
Complaint No. |
Complaint |
Investigation
Findings |
Follow-up
Action / Mitigation Measure |
Lam Tin Side |
|||
570 |
Anonymous |
Investigation on-going |
|
Tseung Kwan O Side |
|||
568 |
Pedestrian |
The complaint is considered as
non-project-related. Measures such as adopting low-sulphur
content diesel as far as possible is recommended. The details can be referred
to CIR-O9. |
Nil |
569 |
DSD |
The complaint is considered as non-project
related as the general condition of the sea is muddy during the date of
incident. The details can be referred to CIR-W19. |
The Contractor is reminded to keep practicing
good site practices such as deploy silt curtain and maintain adequate
capacity of drainage system. |
571 |
Resident of
Ocean Shores |
Preliminary results from noise monitoring showed
no limit level of exceedance and no non-compliance regarding construction
schedule was found. The details shall be referred to CIR-N152. |
The Contractor is reminded to repair or replace damaged
noise barrier and stick to the approved CNMP as far as possible. |
21. Summary of key construction work in
the reporting month is tabulated in Table
IV.
Table IV Summary Table for Key
Construction Work in the Reporting Month
Contract No. |
Project
Title |
Site
Activities (October 2021) |
|
NE/2015/01 |
Tseung Kwan O – Lam Tin
Tunnel – Main Tunnel and Associated Works |
Lam Tin
Interchange |
1)
EHC2 U-Trough
2)
Site Formation Area 1G1 & 1G2 & 5 3)
Site Formation Area 2
4)
Site Formation Slope Stabilization 5) |