3.1
The
weather during monitoring sessions was summarized in Table 3.1.
Table 3.1 Summary of
Weather Conditions in the Reporting Period
Reporting Month |
General Weather Conditions |
November 2016 |
Sunny and Cloudy |
December 2016 |
Sunny and Cloudy |
January 2017 |
Sunny and Cloudy |
3.2
The
detail of weather
conditions for each individual monitoring session was presented in monthly
EM&A report.
3.3
All
1-hour TSP monitoring was conducted as scheduled in the reporting quarter. No
Action/Limit Level exceedance was recorded.
3.4
All 24-hour TSP monitoring was conducted as
scheduled in the reporting quarter, except at Station AM4(A) – Cha Kwo Ling Public Cargo Working Area Administrative Office on
30 December 2016 and 17 January 2017 were cancelled due to power supply
failure. The monitoring were re-scheduled to 6 and 20 January 2017
respectively. No Action/Limit Level exceedance was recorded.
3.5
The
graphical presentations of the air quality monitoring results are shown in Appendix C.
November
2016
3.6
All construction noise was conducted as scheduled
in the reporting month. No Action/Limit Level exceedance was recorded.
December
2016
3.7
All construction noise monitoring was conducted as
scheduled in the reporting month. Nine (9) Action Level exceedance
was recorded due to the documented complaints received from monitoring station
in the reporting month. No Limit Level exceedance was recorded.
January
2017
3.8
All construction noise monitoring was conducted as
scheduled in the reporting month. Fifteen (15) Action Level exceedance was
recorded due to the documented complaints received from monitoring station in
the reporting month. One (1) limit level exceedance was recorded on 23 January
2017 at CM3 – Block 3, Yau Lai Estate Phase 5, Yau Tong. The investigation
results for limit level exceedance in shown in Appendix K.
3.9
The
graphical presentations of the noise monitoring results are shown in Appendix D.
3.10
Groundwater quality monitoring was conducted
as scheduled in the reporting quarter. One (1) Action Level Exceedance and Seventeen
(17) Limit Level exceedance was recorded. According to the information provided by the
Contractor, no tunnel boring or tunnel construction works were carried out in
both Lam Tin side and Tseung Kwan O side in the
reporting quarter. The exceedance are considered to be non-Project
related. The
graphical presentations of the groundwater quality monitoring results are shown in Appendix E.
3.11
Marine water quality monitoring
commenced on 19 December 2016 as marine construction for Tsueng
Kwan O – Lam Tin Tunnel reclamation has commenced accordingly. All marine water
monitoring was conducted as scheduled in December 2016 and January 2017. No
Action/Limit Level exceedance was recorded. The graphical presentations of the marine
water quality
monitoring results are shown in Appendix
F.
3.12
Construction phase daily piezometer monitoring was
not carried out in this reporting period as there is no tunnel construction
activities are carried out within +/- 50m of the piezometer gate in plan.
3.13
Post-translocation coral monitoring survey shall be
conducted once every 3 months for a period of 12 months after completion of
coral translocation. The survey is scheduled in February 2017
tentatively.
3.14
Monitoring
of vibration impacts at Cha Kwo Ling Tin Hau Temple has not commenced in the reporting period as
there is no construction works less than 100m from the temple.
3.15
The implementation of landscape and visual
mitigation measures was checked during the environmental site inspections.
Recommended follow-up actions have been discharged by the Contractor. Details of the audit findings and
implementation status are presented in Appendix
H.
3.16
Monitoring of landfill gases commenced and were
carried out by the Contractor at excavation
location, Portion III in December 2016. No Limit Level
exceedance was recorded in December 2016 and January 2017. The graphical presentations of the
landfill gas
monitoring results are shown in Appendix
G.
3.17
Wastes generated from this Project include inert
construction and demolition (C&D) materials, non-inert C&D materials
and marine sediments. Details of
waste management data is presented in Appendix
I.
3.18
During
the reporting period, the major dust and noise source identified at the
designated monitoring stations are as follows:
Station |
Major Dust Source |
AM1 –
Tin Hau Temple |
Road
Traffic at Cha Kwo Ling Road |
AM2 –
Sai Tso Wan Recreation Ground |
N/A |
AM3 – Yau Lai Estate Bik Lai House |
Road
Traffic near Eastern Cross Harbour Tunnel Toll
Plaza |
AM4(1)
- Sitting-out Area at Cha Kwo Ling Village |
Road
Traffic at Cha Kwo Ling Road |
AM4(A)(2)(*)
- Cha Kwo Ling Public Cargo Working |
Road
Traffic at Cha Kwo Ling Road |
AM5(A)(*)
- Tseung Kwan O DSD Desilting |
Vehicle
Movement within the Desilting |
AM6(A)(*) - Park Central, L1/F
Open Space Area |
Road
Traffic at Po Yap Road |
Table 3.2 Major Dust Sources during the Monitoring in the Reporting Period
Remarks: (1) For 1-hour TSP monitoring; (2) For
24-hour TSP monitoring
(*) Air
quality monitoring at designated station AM4(24-hr
TSP), AM5 and AM6 was rejected by the premise owners. Therefore, baseline and
impact air quality monitoring works were carried out at alternative
air quality monitoring stations AM4(A) (24-hr TSP
only), AM5(A) and AM6(A) respectively.
Table 3.3 Major Noise Sources during the Monitoring in the Reporting Period
Monitoring Stations |
Locations |
Major Noise Source |
CM1 |
Nga Lai House, Yau Lai Estate Phase 1, Yau Tong |
Road Traffic near Eastern Cross Harbour Tunnel Toll Plaza |
CM2 |
Bik Lai House, Yau Lai Estate Phase 1, Yau
Tong |
|
CM3 |
Block S, Yau
Lai Estate Phase 5, Yau Tong |
Road Traffic near Eastern Cross Harbour Tunnel Toll Plaza |
CM4 |
Tin Hau Temple, Cha Kwo
Ling |
Road
Traffic at Cha Kwo Ling Road |
CM5 |
CCC Kei Faat Primary School, Yau Tong |
Road Traffic at Yau Tong Road |
CM6(A)(*) |
Site Boundary of Contract No.
NE/2015/02 near Tower 1, Ocean Shores |
Road Traffic at O King Road near
Ocean Shores |
CM7(A)(*) |
Site Boundary of Contract No.
NE/2015/02 near Tower 7, Ocean Shores |
Road Traffic at Tong Yin Street |
CM8(A)(*) |
Park Central, L1/F Open Space
Area |
Road Traffic at Po Yap Road |
Remarks: *Noise
monitoring at designated station CM6, CM7 & CM8 was rejected by the premise
owners. Therefore, baseline and impact noise monitoring works were carried out
at alternative noise monitoring stations CM6(A),
CM7(A) and CM8(A) respectively.