EXECUTIVE SUMMARY

Introduction

1.      This is the 2nd Quarterly Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the Agreement No. CE 59/2015 (EP) Environmental Team for Tseung Kwan O – Lam Tin Tunnel – Design and Construction (hereinafter called “the Project”).  This summary report presents the EM&A works performed in the period between February 2017 and April 2017.

 

2.      During the reporting quarter, the following works contracts were undertaken within Kai Tak Site:

·     Contract No. NE/2015/01 – Tseung Kwan O – Lam Tin Tunnel – Main Tunnel and Associated Works; and

·     Contract No. NE/2015/02 – Tseung Kwan O – Lam Tin Tunnel – Road P2 and Associated Works.

Environmental Monitoring Works

3.      Environmental monitoring for the Project was performed in accordance with the EM&A Manual and the monitoring results were checked and reviewed.  Site Inspections/Audits were conducted once per week.  The implementation of the environmental mitigation measures, Event Action Plans and environmental complaint handling procedures were also checked.

 

4.      Summary of the non-compliance in the reporting quarter for the Project is tabulated in Table I. Details of the environmental monitoring results is presented in Section 3.

 

Table I      Non-compliance Record for the Project in the Reporting Quarter

Parameter

No. of Exceedance

No. of Exceedance due to Construction Activities of this Project

Action Taken

Action Level

Limit Level

Action Level

Limit Level

February 2017

Air Quality

0

0

0

0

N/A

Noise

2

0

2

0

Refer to Appendix L

Groundwater Quality

1

6

0

0

N/A (Refer to Section 3.12)

Marine Water Quality

0

0

0

0

N/A

Groundwater Level Monitoring (Piezometer Monitoring)

N/A

N/A

N/A

N/A

N/A

Ecological

N/A

N/A

N/A

N/A

N/A

Cultural Heritage

N/A

N/A

N/A

N/A

N/A

Landfill Gas

0

0

0

0

N/A

March 2017

Air Quality

0

0

0

0

N/A

Noise

2

1

1

0

Refer to Appendix L

Groundwater Quality

1

10

0

0

N/A (Refer to Section 3.12)

Marine Water Quality

0

0

0

0

N/A

Groundwater Level Monitoring (Piezometer Monitoring)

N/A

N/A

N/A

N/A

N/A

Ecological

0

0

0

0

N/A

Cultural Heritage

N/A

N/A

N/A

N/A

N/A

Landfill Gas

0

0

0

0

N/A

April 2017

Air Quality

0

0

0

0

N/A

Noise

0

0

0

0

Refer to Appendix L

Groundwater Quality

1

7

0

0

N/A (Refer to Section 3.12)

Marine Water Quality

0

0

0

0

N/A

Groundwater Level Monitoring (Piezometer Monitoring)

N/A

N/A

N/A

N/A

N/A

Ecological

N/A

N/A

N/A

N/A

N/A

Cultural Heritage

0

0

0

0

N/A

Landfill Gas

0

0

0

0

N/A

Key Information in the Reporting Quarter

5.      Summary of key information in the reporting quarter is tabulated in Table II.

 

Table II    Summary Table for Key Information in the Reporting Quarter

Event

Event Details

Action Taken

Status

Remark

Number

Nature

Environmental complaint received

11

Air quality and Construction noise nuisance

Investigation completed

Closed

---

Reporting Changes

0

---

N/A

N/A

---

Notifications of any summons & prosecutions received

0

---

N/A

N/A

---

 

6.      Environmental monitoring works for the Project are considered effective and is generating data to categorically identify the environmental impacts from the works and influencing factors in the vicinity of monitoring stations.