Introduction
Environmental
Monitoring Works
Key
Information in the Reporting Quarter
Background
Project
Organizations
Construction
Activities undertaken during the Report Quarter
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Implementation
Status of Environmental Mitigation Measures
Site
Audit Summary
Status
of Waste Management
Weather
Conditions
Air
Quality
Construction
Noise
Water
Quality
Ecological
Monitoring
Monitoring
on Cultural Heritage
Landscape
and Visual Monitoring and Audit
Landfill
Gas Monitoring
Waste
Managemen
Influencing
Factors on the Monitoring Results
Summary
of Exceedances
Review
of the Reasons for and the Implications of Non-compliance
Summary
of Environmental Complaints and Prosecutions
5. COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
Effectiveness
of Mitigation Measures
Recommendations
LIST
OF TABLE
Table I Summary
Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary
Table for Key Information in the Reporting Quarter
Table 1.1 Key
Project Contacts
Table 3.1 Summary
of Weather Conditions in the Reporting Period
Table 3.2 Major Dust Sources during the Monitoring in
the Reporting Period
Table 3.3 Major Noise Sources during the Monitoring in
the Reporting Period
LIST
OF FIGURES
Figure 2 Locations
of Air Quality Monitoring Stations
Figure 3 Locations
of Construction Noise Monitoring Stations
Figure 4 Locations
of Groundwater Quality Monitoring Stations
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 6 Locations
of Landfill Gas Monitoring
Figure 4.1 Locations
of Noise Sensitive Receivers
Figure 5.1 Locations of Water Quality Sensitive
Receivers
Figure 6.2 Marine
Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas
Figure 9.2 Cultural
Heritage Resources at Cha Kwo Ling
LIST
OF APPENDICES
C Graphical
Presentation of Air Quality Monitoring Results
D Graphical
Presentation of Noise Monitoring Results
E Graphical
Presentation of Groundwater Quality Monitoring Results
F Graphical
Presentation of Marine Water Quality Monitoring Results
G Graphical
Presentation of Landfill Gas Monitoring Results
I Environmental Mitigation
Implementation Schedule (EMIS)
L Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
M Summary Table for Major Site Activities
undertaken in the Reporting Quarter