TABLE OF
CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Quarter
Background
Project Organizations
Construction Activities undertaken during
the Report Quarter
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters and Monitoring
Locations
Monitoring Methodology and Calibration
Details
Environmental Quality Performance Limits
(Action and Limit Levels)
Implementation Status of Environmental
Mitigation Measures
Site Audit Summary
Status of Waste Management
Weather Conditions
Air Quality
Construction Noise
Water Quality
Ecological Monitoring
Monitoring on Cultural Heritage
Landscape and Visual Monitoring and Audit
Landfill Gas Monitoring
Waste Management
Influencing Factors on the Monitoring
Results
Summary of Exceedances
Review of the Reasons for and the
Implications of Non-compliance
Summary of Environmental Complaints and
Prosecutions
5. COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
Effectiveness of Mitigation Measures
Recommendations
LIST OF
TABLE
Table I Summary Table for
Non-compliance Recorded in the Reporting Quarter
Table II Summary Table for Key
Information in the Reporting Quarter
Table 1.1 Key Project Contacts
Table 3.1 Summary of Weather Conditions in the
Reporting Period
Table 3.2 Major
Dust Sources during the Monitoring in the Reporting Period
Table 3.3 Major
Noise Sources during the Monitoring in the Reporting Period
LIST OF
FIGURES
Figure 2 Locations
of Air Quality Monitoring Stations
Figure 3 Locations
of Construction Noise Monitoring Stations
Figure 4 Locations
of Groundwater Quality Monitoring Stations
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 6 Locations
of Landfill Gas Monitoring
Figure 4.1 Locations
of Noise Sensitive Receivers
Figure 5.1 Locations of
Water Quality Sensitive Receivers
Figure 6.2 Marine
Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas
Figure 9.2 Cultural
Heritage Resources at Cha Kwo Ling
LIST OF
APPENDICES
C Graphical Presentation
of Air Quality Monitoring Results
D Graphical Presentation
of Noise Monitoring Results
E Graphical
Presentation of Groundwater Quality Monitoring Results
F Graphical
Presentation of Marine Water Quality Monitoring Results
G Graphical Presentation
of Landfill Gas Monitoring Results
I Environmental
Mitigation Implementation Schedule (EMIS)
L Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
M Summary Table for Major Site Activities
undertaken in the Reporting Quarter