TABLE OF CONTENTS
Introduction
Environmental
Monitoring Works
Key
Information in the Reporting Quarter
Background
Project
Organizations
Construction
Activities undertaken during the Report Quarter
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Implementation
Status of Environmental Mitigation Measures
Site
Audit Summary
Status
of Waste Management
Weather
Conditions
Air
Quality
Construction
Noise
Water
Quality
Ecological
Monitoring
Monitoring
on Cultural Heritage
Landscape
and Visual Monitoring and Audit
Landfill
Gas Monitoring
Waste
Management
Influencing
Factors on the Monitoring Results
Summary
of Exceedances
Review
of the Reasons for and the Implications of Non-compliance
Summary
of Environmental Complaints and Prosecutions
5. COMMENTS, CONCLUSIONS
AND RECOMMENDATIONS
Effectiveness
of Mitigation Measures
Recommendations
LIST OF TABLE
Table I Summary
Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary
Table for Key Information in the Reporting Quarter
Table 1.1 Key
Project Contacts
Table 3.1 Summary
of Weather Conditions in the Reporting Period
Table 3.2 Major Dust Sources during the Monitoring in the Reporting
Period
Table 3.3 Major Noise Sources during the Monitoring in the Reporting
Period
LIST OF FIGURES
Figure 1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site
Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site
Portions under Works Contract No. NE/2015/02
Figure 1d Site
Portions under Works Contract No. NE/2015/03
Figure 1e Site
Portions under Works Contract No. NE/2017/01
Figure 1f Site
Portions under Works Contract No. NE/2017/01
Figure 1g Site
Portions under Works Contract No. NE/2017/02
Figure 1h Site
Portions under Works Contract No. NE/2017/02
Figure 2 Locations
of Air Quality Monitoring Stations
Figure 3 Locations
of Construction Noise Monitoring Stations
Figure 4 Locations
of Groundwater Quality Monitoring Stations
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 6 Locations
of Landfill Gas Monitoring
Figure 7 Location
of Post-translocation Coral Monitoring
Figure 8 Location
of Monitoring for Cultural Heritage
Figure 9 Location
of Water Quality Monitoring in Temporary Embayment
Figure 4.1 Locations
of Noise Sensitive Receivers
Figure 5.1 Locations
of Water Quality Sensitive Receivers
Figure 6.2 Marine
Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas
Figure 9.2 Cultural
Heritage Resources at Cha Kwo Ling
LIST OF APPENDICES
C Graphical
Presentation of Air Quality Monitoring Results
D Graphical
Presentation of Noise Monitoring Results
E Graphical
Presentation of Groundwater Quality Monitoring Results
F Graphical
Presentation of Marine Water Quality Monitoring Results
G Graphical
Presentation of Landfill Gas Monitoring Results
I Environmental Mitigation
Implementation Schedule (EMIS)
L Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
M Summary Table for Major
Site Activities undertaken in the Reporting Quarter