4.1
Environmental monitoring works
were performed in the reporting period and all monitoring results were checked
and reviewed. A summary of
exceedances is attached in Appendix K.
Air
Quality
4.2
No
Action/Limit Level exceedance was recorded in the reporting quarter.
Construction Noise
4.3
Twenty-seven (27) Action Level exceedances were recorded due to the
documented complaints received from monitoring station in the reporting quarter.
No Limit Level exceedance was recorded in the reporting quarter.
Water Quality
4.4
One (1) Action Level and sixteen (16) Limit Level exceedance were
recorded during the groundwater quality monitoring in the reporting quarter. It is considered that the exceedances are considered to
be non-project related.
4.5
No Action and Limit Level exceedances were recorded during marine water
quality monitoring in the reporting quarter.
4.6
Ecological Monitoring
No action/limit level of mortality was exceeded in the monitoring survey
conducted in the reporting quarter.
Monitoring
on Cultural Heritage
4.7
No Alert Alarm and Action (AAA)
Level exceedance was recorded in the reporting quarter.
Landscape
and Visual
4.8
No non-compliance of the landscape and visual
impact was recorded in the reporting quarter.
Landfill
Gas
4.9
No
Limit Level exceedance was recorded in the reporting quarter.
4.10
There
was no non-compliance from the site audits in the reporting quarter. The
observations and recommendations made in each individual site audit session
were attached in the Appendix H.
4.11
Thirty-seven (37) cases of environmental complaints on this
Project were received in the reporting quarter. The details were attached in the Appendix L.
4.12
No warning, summon and notification of successful prosecution was
received in the reporting quarter.