1.
This
is the 7th Quarterly Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the ¡§Agreement No. CE 59/2015 (EP) Environmental Team for Tseung
Kwan O ¡V Lam Tin Tunnel ¡V Design and Construction¡¨ (hereinafter called ¡§the Project¡¨). This summary report presents the EM&A works
performed in the period from May to July 2018.
2.
During the reporting quarter, the following works
contracts were undertaken within the site:
¡P
Contract No. NE/2015/01 ¡V Tseung Kwan O ¡V Lam Tin
Tunnel ¡V Main Tunnel and Associated Works; and
¡P
Contract No. NE/2015/02 ¡V Tseung Kwan O ¡V Lam Tin Tunnel ¡V Road P2 and Associated
Works.
¡P
Contract No. NE/2015/03 ¡V Tseung Kwan O ¡V Lam Tin Tunnel ¡V Northern Footbridge.
¡P
Contract No. NE/2017/01 ¡V Tseung Kwan O ¡V Lam Tin Tunnel ¡V Tseung
Kwan O Interchange and Associated Works.
¡P
Contract No. NE/2017/02 ¡V Tseung Kwan O ¡V Lam Tin Tunnel ¡V Road P2/D4 and Associated
Works.
3.
Environmental
monitoring for the Project was performed in accordance with the EM&A Manual and the monitoring
results were checked
and reviewed. Site Inspections/Audits were conducted once per
week. The implementation of the
environmental mitigation measures, Event Action Plans and environmental
complaint handling procedures were also checked.
4. Summary of the non-compliance in
the reporting quarter for the Project is tabulated in Table I. Details of the environmental monitoring results is
presented in Section 3.
Table I Non-compliance (Exceedance)
Record for the Project in the Reporting Quarter
Parameter |
No. of Exceedance |
No. of Exceedance due to Construction Activities of this Project |
Action Taken |
||
Action Level |
Limit Level |
Action Level |
Limit Level |
||
May 2018 |
|||||
Air Quality |
0 |
0 |
0 |
0 |
N/A |
Noise |
16 |
0 |
16 |
0 |
Refer to
Appendix L |
Groundwater Quality |
0 |
3 |
0 |
0 |
N/A (Refer to
Section 3.10) |
Marine Water Quality |
0 |
0 |
0 |
0 |
N/A |
Groundwater Level Monitoring (Piezometer
Monitoring) |
N/A |
N/A |
N/A |
N/A |
N/A |
Ecological |
0 |
0 |
0 |
0 |
N/A |
Cultural
Heritage |
0 |
0 |
0 |
0 |
N/A |
Landfill Gas |
0 |
0 |
0 |
0 |
N/A |
June
2018 |
|||||
Air Quality |
0 |
0 |
0 |
0 |
N/A |
Noise |
4 |
12 |
4 |
0 |
Refer to
Appendix L |
Groundwater Quality |
0 |
14 |
0 |
0 |
N/A (Refer to
Section 3.11) |
Marine Water Quality |
0 |
0 |
0 |
0 |
N/A |
Groundwater Level Monitoring (Piezometer
Monitoring) |
0 |
N/A(1) |
0 |
N/A(1) |
N/A |
Ecological |
N/A |
N/A |
N/A |
N/A |
N/A |
Cultural
Heritage |
0 |
0 |
0 |
0 |
N/A |
Landfill Gas |
0 |
0 |
0 |
0 |
N/A |
July 2018 |
|||||
Air Quality |
0 |
0 |
0 |
0 |
N/A |
Noise |
5 |
12 |
5 |
0 |
Refer to
Appendix L |
Groundwater Quality |
0 |
20 |
0 |
0 |
N/A (Refer to
Section 3.12) |
Marine Water Quality |
0 |
0 |
0 |
0 |
N/A |
Groundwater Level Monitoring (Piezometer
Monitoring) |
0 |
N/A(1) |
0 |
N/A(1) |
N/A |
Ecological |
N/A |
N/A |
N/A |
N/A |
N/A |
Cultural
Heritage |
0 |
0 |
0 |
0 |
N/A |
Landfill Gas |
0 |
0 |
0 |
0 |
N/A |
Note: (1) No Limit
Level for Groundwater Level Monitoring (Piezometer Monitoring).
5. Summary
of key information in the reporting quarter is tabulated in Table II.
Table II Summary Table
for Key Information in the Reporting Quarter
Event |
Event Details |
Action Taken |
Status |
Remark |
|
Number |
Nature |
||||
Complaint received / Complaint referred by EPD (July 2018) |
9 |
Construction dust/ Noise nuisance/ Water Quality |
Investigation completed |
On-going |
Details refer to
App L |
Complaint received / Complaint referred by EPD (June 2018) |
11 |
Construction dust/ Noise nuisance/ Odour/ Dark Smoke/ Waste
management/ Landscape |
Investigation completed |
Closed |
|
Complaint received / Complaint referred by EPD (May 2018) |
22 |
Construction dust / Noise nuisance/ Odour |
Investigation completed |
Closed |
|
Reporting Changes |
0 |
--- |
N/A |
N/A |
--- |
Notifications
of any summons & prosecutions received (July 2018) |
0 |
--- |
N/A |
N/A |
--- |
Notifications
of any summons & prosecutions received (June 2018) |
1 |
Construction Noise |
N/A |
N/A |
Details refer to
App L |
Notifications
of any summons & prosecutions received (May 2018) |
0 |
--- |
N/A |
N/A |
--- |
6.
Environmental monitoring works for the Project are
considered effective and is generating data to categorically identify the
environmental impacts from the works and influencing factors in the vicinity of
monitoring stations.