TABLE OF CONTENTS
Introduction
Environmental Monitoring Work
Key Information in the Reporting Quarter
Background
Project Organizations
Construction Activities undertaken during
the Report Quarter
2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters and Monitoring
Locations
Monitoring Methodology and Calibration
Details
Environmental Quality Performance Limits
(Action and Limit Levels)
Implementation Status of Environmental
Mitigation Measures
Site Audit Summary
Status of Waste Management
Weather Conditions
Air Quality
Construction Noise
Water Quality
Ecological Monitoring
Monitoring on Cultural Heritage
Landscape and Visual Monitoring and Audit
Landfill Gas Monitoring
Waste Management
Influencing Factors on the Monitoring
Results
Summary of Exceedances
Review of the Reasons for and the Implications
of Non-compliance
Summary of Environmental Complaints and
Prosecutions
5. COMMENTS, CONCLUSIONS AND RECOMMENDATIONS
Effectiveness of Mitigation Measures
Recommendations
LIST
OF TABLE
Table I Summary Table for Non-compliance
Recorded in the Reporting Quarter
Table II Summary Table for Key Information in
the Reporting Quarter
Table 1.1 Key
Project Contacts
Table 3.1 Summary of Weather Conditions in the
Reporting Period
Table 3.2 Summary
of Documented Complaints in August 2019
Table 3.3 Summary
of Documented Complaints in September 2019
Table 3.4 Summary of Documented Complaints in October 2019
Table 3.5
Major Dust Sources during the Monitoring
in the Reporting Period
Table 3.6
Major Noise Sources during the
Monitoring in the Reporting Period
lIST OF FIGUREs
Figure 1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site
Portions under Works Contract No. NE/2015/01 (Tseung
Kwan O Side)
Figure 1c Site
Portions under Works Contract No. NE/2015/02
Figure 1d Site
Portions under Works Contract No. NE/2015/03
Figure 1e Site
Portions under Works Contract No. NE/2017/01
Figure 1f Site
Portions under Works Contract No. NE/2017/01
Figure 1g Site
Portions under Works Contract No. NE/2017/02
Figure 1h Site
Portions under Works Contract No. NE/2017/02
Figure 2 Locations
of Air Quality Monitoring Stations
Figure 3 Locations
of Construction Noise Monitoring Stations
Figure 4 Locations
of Groundwater Quality Monitoring Stations
Figure 4.1 Locations
of Noise Sensitive Receivers
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 5.1 Locations of Water Quality Sensitive Receivers
Figure 6 Locations
of Landfill Gas Monitoring
Figure 6.2 Marine
Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas
Figure 7 Location of
Post-translocation Coral Monitoring
Figure 8 Locations
of Monitoring for Cultural Heritage
Figure 9 Location
of Water Quality Monitoring Stations within Temporary Marine Embayment
Figure 9.2 Cultural
Heritage Resources at Cha Kwo Ling
LIST
OF APPENDICES
C Graphical
Presentation of Air Quality Monitoring Results
D Graphical
Presentation of Noise Monitoring Results
E Graphical
Presentation of Groundwater Quality Monitoring Results
F Graphical
Presentation of Marine Water Quality Monitoring Results
G Graphical Presentation of
Landfill Gas Monitoring Results
I Environmental Mitigation Implementation Schedule
(EMIS)
L Summaries of Environmental
Complaint, Warning, Summon and Notification of Successful Prosecution
M Summary Table
for Major Site Activities undertaken in the Reporting Quarter