TABLE OF CONTENTS
Introduction
Environmental Monitoring Work
Key Information in the Reporting Quarter
Background
Project Organizations
Construction Activities undertaken during the Report Quarter
2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters and Monitoring Locations
Monitoring Methodology and Calibration Details
Environmental Quality Performance Limits (Action and Limit Levels)
Implementation Status of Environmental Mitigation Measures
Site Audit Summary
Status of Waste Management
Weather Conditions
Air Quality
Construction Noise
Water Quality
Ecological Monitoring
Monitoring on Cultural Heritage
Landscape and Visual Monitoring and Audit
Landfill Gas Monitoring
Waste Management
Influencing Factors on the Monitoring Results
Summary of Exceedances
Review of the Reasons for and the Implications of Non-compliance
Summary of Environmental Complaints and Prosecutions
5. COMMENTS, CONCLUSIONS AND RECOMMENDATIONS
Effectiveness of Mitigation Measures
Recommendations
LIST OF TABLE
Table I Summary Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary Table for Key Information in the Reporting Quarter
Table 1.1 Key Project Contacts
Table
3.1 Summary of Weather
Conditions in the Reporting Period
Table 3.2 Summary of Documented Complaints in August 2019
Table 3.3 Summary of Documented Complaints in September 2019
Table 3.4 Summary of Documented Complaints in October 2019
Table 3.5 Major Dust Sources during the Monitoring in the Reporting Period
Table 3.6 Major Noise Sources during the Monitoring in the Reporting Period
lIST OF FIGUREs
Figure 1a Site Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site Portions under Works Contract No. NE/2015/02
Figure 1d Site Portions under Works Contract No. NE/2015/03
Figure 1e Site Portions under Works Contract No. NE/2017/01
Figure 1f Site Portions under Works Contract No. NE/2017/01
Figure 1g Site Portions under Works Contract No. NE/2017/02
Figure 1h Site Portions under Works Contract No. NE/2017/02
Figure 2 Locations of Air Quality Monitoring Stations
Figure 3 Locations of Construction Noise Monitoring Stations
Figure 4 Locations of Groundwater Quality Monitoring Stations
Figure 4.1 Locations of Noise Sensitive Receivers
Figure 5 Locations of Marine Water Quality Monitoring Stations
Figure 5.1 Locations of Water Quality Sensitive Receivers
Figure 6 Locations of Landfill Gas Monitoring
Figure 6.2 Marine Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas
Figure 7 Location of Post-translocation Coral Monitoring
Figure 8 Locations of Monitoring for Cultural Heritage
Figure 9 Location of Water Quality Monitoring Stations within Temporary Marine Embayment
Figure 9.2 Cultural Heritage Resources at Cha Kwo Ling
LIST OF APPENDICES
C Graphical Presentation of Air Quality Monitoring Results
D Graphical Presentation of Noise Monitoring Results
E (Nil)
F Graphical Presentation of Marine Water Quality Monitoring Results
G Graphical Presentation of Landfill Gas Monitoring Results
I Environmental Mitigation Implementation Schedule (EMIS)
L Summaries of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution
M Summary Table for Major Site Activities undertaken in the Reporting Quarter