TABLE
OF CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Month
Future Key Issues
Purpose of the Report
Structure of the Report
Background
Project Organizations
Construction Activities undertaken during
the Reporting Month
Status of Environmental Licences,
Notification and Permits
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Methodology and QA/QC Procedure
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Parameters and Frequency
Monitoring Methodology
Laboratory Analytical Methods
QA/QC Requirements
Decontamination Procedures
Sampling Management and Supervision
Results and Observations
Post-Translocation Coral Monitoring
7. MONITORING
ON CULTURAL HERITAGE
8. LANDSCAPE
AND VISUAL IMPACT REQUIREMENTS
Monitoring Requirement
Monitoring Parameters, Locations and
Frequency
Results and Observations
Site Audits
Implementation Status of Environmental
Mitigation Measures
12. ENVIRONMENTAL
NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and
Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
14. CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST
OF TABLES
Table I Non-compliance
Recorded for the Project in the Reporting Month
Table II Summary Table for
Key Information in the Reporting Month
Table 2.1 Key Project Contacts
Table 2.2 Summary Table for Major Site Activities
in the Reporting Month
Table 2.4 Summary of the
Status of Environmental Licences, Notification and Permits
Table 3.1 Locations for Air Quality
Monitoring
Table 3.2 Air Quality Monitoring
Equipment
Table 3.3 Impact Dust Monitoring
Parameters, Frequency and Duration
Table 3.4 Major Dust Source during Air Quality
Monitoring
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters,
Frequency and Duration
Table 4.4 Major Noise Source during Noise
Monitoring
Table 4.5 Baseline Noise
Level and Noise Limit Level for Monitoring Stations
Table 5.1 Groundwater Quality
Monitoring Stations
Table 5.2 Marine Water Quality Monitoring
Stations
Table 5.3
Water Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring
Parameters and Frequency
Table 5.5 Methods for Laboratory Analysis
for Water Samples
Table 5.6 Summary of
Groundwater Quality Monitoring Results
Table 9.1 Landfill
Gas Monitoring Equipment
Table 10.1 Observations
and Recommendations of Site Audit
Table 13.1 Summary
Table for Site Activities in the next Reporting Period
LIST
OF FIGURES
Figure 2 Locations of Air Quality Monitoring
Stations
Figure 3 Locations of Construction Noise
Monitoring Stations
Figure 4 Locations of Groundwater Quality
Monitoring Stations
Figure 5 Locations of Marine Water Quality
Monitoring Stations
Figure 6 Locations of Landfill Gas Monitoring
LIST
OF APPENDICES
Appendix
A Action and Limit
Levels
Appendix
B Copies of Calibration
Certificates
Appendix C Weather Information
Appendix
D Environmental
Monitoring Schedules
Appendix
E 1-hour TSP
Monitoring Results and Graphical Presentations
Appendix
F 24-hour TSP
Monitoring Results and Graphical Presentations
Appendix
G Noise Monitoring
Results and Graphical Presentations
Appendix I Marine Water
Quality Monitoring Results and Graphical Presentations
Appendix J Quality Control
Reports for Laboratory Analysis
Appendix K Summary of Exceedance
Appendix M Event and Action Plans
Appendix
N Implementation
Schedule And Recommended Mitigation Measures
Appendix P Waste Generation in the
Reporting Month