TABLE OF
CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Month
Key Construction Work in the reporting
month & the next reporting month
Future Key Issues
Purpose of the Report
Structure of the Report
Background
Project Organizations
Construction Activities undertaken during
the Reporting Month
Status of Environmental Licences, Notification and Permits
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Methodology and QA/QC Procedure
Results and Observations
Updated Construction Noise Assessment
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Parameters and Frequency
Monitoring Methodology
Laboratory Analytical Methods
QA/QC Requirements
Decontamination Procedures
Sampling Management and Supervision
Results and Observations
Post-Translocation Coral Monitoring
Event and Action Plan
Results and Observations
Monitoring Requirement
Monitoring Locations
Monitoring Equipment
Monitoring Methodology
Alert, Alarm and Action Levels
Results
Mitigation Measures for Cultural Heritage
8. LANDSCAPE
AND VISUAL IMPACT REQUIREMENTS
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Site Audits
Implementation Status of Environmental
Mitigation Measures
12. ENVIRONMENTAL
NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and
Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
14. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF
TABLES
Table I Non-compliance (exceedance)
Recorded for the Project in the Reporting Month
Table II Summary Table
for Key Information in the Reporting Month
Table III
Summary Table for Key Construction Work in the Reporting Month
Table IV Summary
Table for Site Activities in the next Reporting Period
Table 2.1 Key Project Contacts
Table 2.2 Summary Table for Major Site Activities
in the Reporting Month
Table 2.4
Summary of the Status of Environmental Licences, Notification and Permits
Table 3.1
Locations for Air Quality Monitoring
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Major Dust Source during Air Quality
Monitoring
Table 4.1 Noise
Monitoring Stations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Frequency and Duration
Table 4.4 Major
Noise Source during Noise Monitoring
Table 4.5
Baseline Noise Level and Noise Limit Level for Monitoring Stations
Table 5.1
Groundwater Quality Monitoring Stations
Table 5.2 Marine Water Quality Monitoring Stations
Table 5.3 Water
Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring Parameters and
Frequency
Table 5.5 Methods for Laboratory Analysis for Water
Samples
Table 5.6
Summary of Groundwater Quality Monitoring Results
Table 6.1 Location and Physical attributes
of the Coral Recipient Site
Table 7.1 Cultural
Heritage Monitoring Equipment
Table 7.2 AAA Levels for Monitoring for Cultural
Heritage
Table 9.1 Landfill Gas Monitoring Equipment
Table 13.1
Summary Table for Site Activities in the next Reporting Period
LIST OF
FIGURES
Figure 1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site
Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site
Portions under Works Contract No. NE/2015/02
Figure 1d Site Portions under Works Contract No.
NE/2015/03
Figure 1e Site Portions under Works Contract No.
NE/2017/01
Figure 1f Site Portions under Works Contract No.
NE/2017/01
Figure 1g Site Portions under Works Contract No.
NE/2017/02
Figure 1h Site Portions under Works Contract No.
NE/2017/02
Figure 2 Locations of Air Quality Monitoring
Stations
Figure 3 Locations of Construction Noise
Monitoring Stations
Figure 4 Locations of Groundwater Quality
Monitoring Stations
Figure 5 Locations of Marine Water Quality
Monitoring Stations
Figure 6 Locations of Landfill Gas Monitoring
Figure 7 Location of Post-translocation
Coral Monitoring
Figure 8 Location of Monitoring for Cultural
Heritage
Figure 9 Location of Water Quality
Monitoring in Temporary Embayment
LIST OF
APPENDICES
Appendix
A Action and Limit
Levels
Appendix
B Copies of Calibration
Certificates
Appendix
C Weather Information
Appendix
D Environmental
Monitoring Schedules
Appendix
E 1-hour TSP
Monitoring Results and Graphical Presentations
Appendix
F 24-hour TSP
Monitoring Results and Graphical Presentations
Appendix
G Noise Monitoring
Results and Graphical Presentations
Appendix
I Marine
Water Quality Monitoring Results and Graphical Presentations
Appendix
J Quality
Control Reports for Laboratory Analysis
Appendix K Summary of Exceedance
Appendix
M Event and Action Plans
Appendix
N Implementation
Schedule And Recommended Mitigation Measures
Appendix P Waste Generation in the
Reporting Month
Appendix Q Tentative Construction
Programme
Appendix R Record of Landfill Gas
Monitoring by Contractor