TABLE OF
CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Month
Key Construction Work in the reporting
month & the next reporting month
Future Key Issues
Purpose of the Report
Structure of the Report
Background
Project Organizations
Construction Activities undertaken during
the Reporting Month
Status of Environmental Licences,
Notification and Permits
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Methodology and QA/QC Procedure
Results and Observations
Updated Construction Noise Assessment
Monitoring Requirements
Monitoring Locations
Monitoring Equipments
Monitoring Parameters and Frequency
Monitoring Methodology
Laboratory Analytical Methods
QA/QC Requirements
Decontamination Procedures
Sampling Management and Supervision
Results and Observations
Post-Translocation Coral Monitoring
Event and Action Plan
Monitoring Requirement
Monitoring Locations
Monitoring Equipment
Monitoring Methodology
Alert, Alarm and Action Levels
Results
Mitigation Measures for Cultural Heritage
8. LANDSCAPE
AND VISUAL IMPACT REQUIREMENTS
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Site Audits
Implementation Status of Environmental
Mitigation Measures
12. ENVIRONMENTAL NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and
Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
14. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF
TABLES
Table I
Non-compliance (exceedance) Recorded for the Project in the Reporting
Month
Table II Summary Table for Key
Information in the Reporting Month
Table III Summary Table for Key Construction
Work in the Reporting Month
Table IV Summary Table for Site Activities in the
next Reporting Period
Table 2.1 Key Project Contacts
Table 2.2 Summary Table for Major Site Activities
in the Reporting Month
Table 2.4 Summary of the Status of Environmental
Licences, Notification and Permits
Table 3.1 Locations for Air Quality Monitoring
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters,
Frequency and Duration
Table 3.4 Major Dust Source during Air Quality
Monitoring
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Frequency
and Duration
Table 4.4 Major Noise Source during Noise
Monitoring
Table 4.5 Baseline Noise Level and Noise Limit
Level for Monitoring Stations
Table 4.7 Baseline Noise Level and Noise Limit
Level for Monitoring Stations (Night-time)
Table 5.1 Groundwater Quality Monitoring Stations
Table 5.2 Marine Water Quality Monitoring Stations
Table 5.3 Water Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring Parameters and
Frequency
Table 5.5 Methods for Laboratory Analysis for
Water Samples
Table 5.6 Summary of Groundwater Quality
Monitoring Results
Table 6.1 Location and Physical attributes of the
Coral Recipient Site
Table 7.1 Cultural Heritage Monitoring Equipment
Table 7.2 AAA Levels for Monitoring for Cultural
Heritage
Table 9.1 Landfill Gas Monitoring Equipment
Table 13.1 Summary Table for Site Activities in the
next Reporting Period
LIST OF
FIGURES
Figure 1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site
Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site
Portions under Works Contract No. NE/2015/02
Figure 1d Site
Portions under Works Contract No. NE/2015/03
Figure 1e Site
Portions under Works Contract No. NE/2017/01
Figure 1f Site
Portions under Works Contract No. NE/2017/01
Figure 1g Site
Portions under Works Contract No. NE/2017/02
Figure 1h Site
Portions under Works Contract No. NE/2017/02
Figure 2 Locations of Air Quality Monitoring
Stations
Figure 3 Locations of Construction Noise Monitoring
Stations
Figure 4 Locations of Groundwater Quality Monitoring
Stations
Figure 5 Locations of Marine Water Quality Monitoring
Stations
Figure 6 Locations of Landfill Gas
Monitoring
Figure 7 Location of Post-translocation Coral Monitoring
Figure 8 Location of Monitoring for Cultural Heritage
Figure 9 Location of Water Quality Monitoring in
Temporary Embayment
LIST OF
APPENDICES
Appendix
A Action and Limit Levels
Appendix
B Copies of Calibration Certificates
Appendix C Weather Information
Appendix
D Environmental Monitoring Schedules
Appendix
E 1-hour TSP Monitoring Results and Graphical Presentations
Appendix
F 24-hour TSP Monitoring Results and Graphical Presentations
Appendix
G Noise Monitoring Results and Graphical Presentations
Appendix I Marine Water Quality
Monitoring Results and Graphical Presentations
Appendix
J Quality Control Reports for Laboratory Analysis
Appendix K Summary of
Exceedance
Appendix M Event and
Action Plans
Appendix
N Implementation Schedule And Recommended Mitigation Measures
Appendix P Waste
Generation in the Reporting Month
Appendix Q Tentative
Construction Programme
Appendix R Record of Landfill
Gas Monitoring by Contractor
Appendix
S Updated Construction Noise Assessment