Cover_v1.0(signed)

 

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

Introduction

Environmental Monitoring Works

Key Information in the Reporting Month

Key Construction Work in the reporting month & the next reporting month

Future Key Issues

1.    INTRODUCTION

Purpose of the Report

Structure of the Report

2.    PROJECT INFORMATION

Background

Project Organizations

Construction Activities undertaken during the Reporting Month

Status of Environmental Licences, Notification and Permits

Summary of EM&A Requirements

3.    AIR QUALITY

Monitoring Requirements

Monitoring Locations

Monitoring Equipment

Monitoring Parameters and Frequency

Monitoring Methodology

Results and Observations

4.    NOISE

Monitoring Requirements

Monitoring Locations

Monitoring Equipments

Monitoring Methodology and QA/QC Procedure

Results and Observations

Updated Construction Noise Assessment

5.    WATER QUALITY

Monitoring Requirements

Monitoring Locations

Monitoring Equipments

Monitoring Parameters and Frequency

Monitoring Methodology

Laboratory Analytical Methods

QA/QC Requirements

Decontamination Procedures

Sampling Management and Supervision

Results and Observations

6.    ECOLOGY

Post-Translocation Coral Monitoring

Event and Action Plan

 

7.    CULTURAL HERITAGE

Monitoring Requirement

Monitoring Locations

Monitoring Equipment

Monitoring Methodology

Alert, Alarm and Action Levels

Results

Mitigation Measures for Cultural Heritage

8.    LANDSCAPE AND VISUAL IMPACT REQUIREMENTS

9.LANDFILL GAS MONITORING

Monitoring Requirement

Monitoring Parameters and Frequency

Monitoring Locations

Monitoring Equipment

Results and Observations

10. ENVIRONMENTAL AUDIT

Site Audits

Implementation Status of Environmental Mitigation Measures

11. WASTE MANAGEMENT

12. ENVIRONMENTAL NON-CONFORMANCE

Summary of Exceedances

Summary of Environmental Non-Compliance

Summary of Environmental Complaint

Summary of Environmental Summon and Successful Prosecution

13. FUTURE KEY ISSUES .

Key Issues for the Coming Month

Monitoring Schedule for the Next Month

14. CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

 

LIST OF TABLES

 

Table I       Non-compliance (exceedance) Recorded for the Project in the Reporting Month

Table II     Summary Table for Key Information in the Reporting Month

Table III   Summary Table for Key Construction Work in the Reporting Month

Table IV  Summary Table for Site Activities in the next Reporting Period

Table 2.1  Key Project Contacts

Table 2.2  Summary Table for Major Site Activities in the Reporting Month

Table 2.3  Construction Programme Showing the Inter-Relationship with Environmental Protection/Mitigation Measures

Table 2.4  Summary of the Status of Environmental Licences, Notification and Permits

Table 3.1  Locations for Air Quality Monitoring

Table 3.2  Air Quality Monitoring Equipment

Table 3.3  Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.4  Major Dust Source during Air Quality Monitoring

Table 4.1  Noise Monitoring Stations

Table 4.2  Noise Monitoring Equipment

Table 4.3  Noise Monitoring Parameters, Frequency and Duration

Table 4.4  Major Noise Source during Noise Monitoring

Table 4.5  Baseline Noise Level and Noise Limit Level for Monitoring Stations

Table 4.6  Baseline Noise Level and Noise Limit Level for Monitoring Stations (Evening-time & Daytime (Holiday))

Table 4.7  Baseline Noise Level and Noise Limit Level for Monitoring Stations (Night-time)

Table 5.1  Groundwater Quality Monitoring Stations

Table 5.2  Marine Water Quality Monitoring Stations

Table 5.3  Water Quality Monitoring Equipment

Table 5.4  Water Quality Monitoring Parameters and Frequency

Table 5.5  Methods for Laboratory Analysis for Water Samples

Table 5.6  Summary of Groundwater Quality Monitoring Results

Table 6.1  Location and Physical attributes of the Coral Recipient Site

Table 7.1  Cultural Heritage Monitoring Equipment

Table 7.2  AAA Levels for Monitoring for Cultural Heritage

Table 9.1   Landfill Gas Monitoring Equipment

Table 13.1  Summary Table for Site Activities in the next Reporting Period

 

LIST OF FIGURES

 

Figure 1 Site Layout Plan 

Figure 1a Site Portions under Works Contract No. NE/2015/01 (Lam Tin Side)

Figure 1b Site Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)

Figure 1c Site Portions under Works Contract No. NE/2015/02

Figure 1d Site Portions under Works Contract No. NE/2015/03

Figure 1e Site Portions under Works Contract No. NE/2017/01

Figure 1f Site Portions under Works Contract No. NE/2017/01

Figure 1g Site Portions under Works Contract No. NE/2017/02

Figure 1h Site Portions under Works Contract No. NE/2017/02

Figure 2 Locations of Air Quality Monitoring Stations 

Figure 3 Locations of Construction Noise Monitoring Stations

Figure 4 Locations of Groundwater Quality Monitoring Stations

Figure 5 Locations of Marine Water Quality Monitoring Stations

Figure 6  Locations of Landfill Gas Monitoring 

Figure 7 Location of Post-translocation Coral Monitoring

Figure 8 Location of Monitoring for Cultural Heritage

Figure 9 Location of Water Quality Monitoring in Temporary Embayment  

 

 

LIST OF APPENDICES

 

Appendix A Action and Limit Levels 

Appendix B Copies of Calibration Certificates

Appendix C Weather Information

Appendix D Environmental Monitoring Schedules

Appendix E 1-hour TSP Monitoring Results and Graphical Presentations 

Appendix F 24-hour TSP Monitoring Results and Graphical Presentations 

Appendix G Noise Monitoring Results and Graphical Presentations

Appendix H Groundwater Quality Monitoring Results, Graphical Presentations and Laboratory Testing Reports

Appendix I Marine Water Quality Monitoring Results and Graphical Presentations

Appendix J Quality Control Reports for Laboratory Analysis 

Appendix K Summary of Exceedance

Appendix L Site Audit Summary 

Appendix M Event and Action Plans 

Appendix N Implementation Schedule And Recommended Mitigation Measures

Appendix O Summaries of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution

Appendix P Waste Generation in the Reporting Month

Appendix Q Tentative Construction Programme

Appendix R Record of Landfill Gas Monitoring by Contractor

Appendix S Updated Construction Noise Assessment

Appendix T Cultural Heritage Monitoring Results 

Appendix U Piezometer Monitoring Results