TABLE OF
CONTENTS
Introduction
Environmental Monitoring Works
Key Information in the Reporting Month
Key Construction Work in the reporting month & the next reporting month
Future Key Issues
1.
INTRODUCTION
Purpose of the Report
Structure of the Report
Background
Project Organizations
Construction Activities undertaken during the Reporting Month
Status of Environmental Licences, Notification and Permits
Summary of EM&A Requirements
3.
AIR QUALITY
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Results and Observations
4.
NOISE
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Methodology and QA/QC Procedure
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters and Frequency
Monitoring Methodology
Laboratory Analytical Methods
QA/QC Requirements
Decontamination Procedures
Sampling Management and Supervision
Results and Observations
6.
ECOLOGY
Post-Translocation Coral Monitoring
Monitoring Requirement
Monitoring Locations
Monitoring Equipment
Monitoring Methodology
Alert, Alarm and Action Levels
Results
Mitigation Measures for Cultural Heritage
8.
LANDSCAPE AND VISUAL IMPACT REQUIREMENTS
Monitoring Requirement
Monitoring Parameters and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Site Audits
Implementation Status of Environmental Mitigation Measures
11.
WASTE MANAGEMENT
12.
ENVIRONMENTAL NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental Non-Compliance
Summary of Environmental Complaint
Summary of Environmental Summon and Successful Prosecution
Key Issues for the Coming Month
14.
CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
lIST OF TABLES
Table I Non-compliance (exceedance) Recorded for the Project in the Reporting Month
Table II Summary Table for Key Information in the Reporting Month
Table
III Summary
Table for Key Construction Work in the Reporting Month
Table
IV Summary
Table for Site Activities in the next Reporting Period
Table 2.1 Key Project Contacts
Table 2.2 Summary Table for Major Site Activities in the Reporting Month
Table 2.4 Summary of the Status of Environmental Licences, Notification and
Permits
Table 3.1 Locations for Air Quality Monitoring
Table 3.2 Air Quality Monitoring Equipment
Table 3.3 Impact Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Major Dust Source during Air Quality Monitoring
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Noise Monitoring Parameters, Frequency and Duration
Table 4.4 Major Noise Source during
Noise Monitoring
Table 4.5 Baseline Noise Level and Noise Limit Level for Monitoring Stations
Table 4.7 Baseline Noise Level and Noise Limit Level for Monitoring
Stations (Night-time)
Table 5.1 Groundwater
Quality Monitoring Stations
Table 5.2 Marine Water Quality Monitoring Stations
Table 5.3 Water
Quality Monitoring Equipment
Table 5.4 Water Quality Monitoring Parameters and Frequency
Table 5.5 Methods for Laboratory Analysis for Water Samples
Table 5.6 Summary
of Groundwater Quality Monitoring Results
Table 7.1
Cultural Heritage Monitoring
Equipment
Table 7.2 AAA Levels for Monitoring for Cultural
Heritage
Table 9.1 Landfill Gas Monitoring Equipment
Table 13.1 Summary Table for Site Activities in the next Reporting Period
lIST OF FIGUREs
Figure 1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure 1b Site Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure 1c Site
Portions under Works Contract No. NE/2015/02
Figure 1d Site
Portions under Works Contract No. NE/2015/03
Figure 1e Site Portions under Works Contract No. NE/2017/01
Figure 1f Site
Portions under Works Contract No. NE/2017/01
Figure 1g Site
Portions under Works Contract No. NE/2017/02
Figure 1h Site
Portions under Works Contract No. NE/2017/02
Figure 2 Locations
of Air Quality Monitoring Stations
Figure 3 Locations
of Construction Noise Monitoring Stations
Figure 4 Locations
of Groundwater Quality Monitoring Stations
Figure 5 Locations
of Marine Water Quality Monitoring Stations
Figure 6 Locations
of Landfill Gas Monitoring
Figure 7 Location
of Post-translocation Coral Monitoring
Figure 8 Location of Monitoring for Cultural Heritage
Figure 9 Location
of Water Quality Monitoring in Temporary Embayment
lIST OF APPENDIces
Appendix A
Action and Limit Levels
Appendix
B
Copies of
Calibration Certificates
Appendix C Weather Information
Appendix D
Environmental Monitoring Schedules
Appendix E
1-hour TSP Monitoring Results and Graphical Presentations
Appendix F
24-hour TSP Monitoring Results and
Graphical Presentations
Appendix G
Noise Monitoring Results and Graphical Presentations
Appendix H Groundwater
Quality Monitoring Results, Graphical Presentations and Laboratory Testing
Reports
Appendix I
Marine Water Quality Monitoring Results and
Graphical Presentations
Appendix J
Quality
Control Reports for Laboratory Analysis
Appendix K
Summary of Exceedance
Appendix L
Site Audit Summary
Appendix M Event and Action Plans
Appendix N Implementation Schedule And
Recommended Mitigation Measures
Appendix O Summaries of
Environmental Complaint, Warning, Summon and Notification of Successful
Prosecution
Appendix P
Waste Generation in the Reporting
Month
Appendix Q Tentative Construction Programme
Appendix R
Record of Landfill Gas Monitoring by Contractor
Appendix S
(Nil)
Appendix T
Cultural Heritage Monitoring Results
Appendix U Piezometer Monitoring Results