TABLE OF CONTENTS

 

EXECUTIVE SUMMARY.. 1

Introduction. 1

Environmental Monitoring Works. 1

Key Information in the Reporting Month. 3

Key Construction Work in the reporting month & the next reporting month. 4

Future Key Issues. 6

1.       introduction.. 9

Purpose of the Report 9

Structure of the Report 9

2.       PROJECT INFORMATION.. 11

Background. 11

Project Organizations. 11

Construction Activities undertaken during the Reporting Month. 12

Status of Environmental Licences, Notification and Permits. 14

Summary of EM&A Requirements. 14

3.       AIR QUALITY.. 17

Monitoring Requirements. 17

Monitoring Locations. 17

Monitoring Equipment 17

Monitoring Parameters and Frequency. 18

Monitoring Methodology. 18

Results and Observations. 21

4.       NOISE.. 22

Monitoring Requirements. 22

Monitoring Locations. 22

Monitoring Equipment 22

Monitoring Methodology and QA/QC Procedure. 23

Results and Observations. 24

5.       WATER QUALITY.. 27

Monitoring Requirements. 27

Monitoring Locations. 28

Monitoring Equipment 28

Monitoring Parameters and Frequency. 30

Monitoring Methodology. 31

Laboratory Analytical Methods. 32

QA/QC Requirements. 32

Decontamination Procedures. 32

Sampling Management and Supervision. 33

Results and Observations. 33

6.       ECOLOGY.. 37

Post-Translocation Coral Monitoring. 37


 

7.       cultural heritage.. 38

Monitoring Requirement 38

Monitoring Locations. 38

Monitoring Equipment 38

Monitoring Methodology. 39

Alert, Alarm and Action Levels. 39

Results. 39

Mitigation Measures for Cultural Heritage. 39

8.       LANDSCAPE AND VISUAL IMPACT REQUIREMENTS. 40

9.       LANDFILL GAS MONITORING.. 41

Monitoring Requirement 41

Monitoring Parameters and Frequency. 41

Monitoring Locations. 41

Monitoring Equipment 41

Results and Observations. 42

10.    ENVIRONMENTAL AUDIT.. 43

Site Audits. 43

Implementation Status of Environmental Mitigation Measures. 43

11.    WASTE MANAGEMENT.. 44

12.    ENVIRONMENTAL NON-CONFORMANCE.. 45

Summary of Exceedances. 45

Summary of Environmental Non-Compliance. 45

Summary of Environmental Complaint 45

Summary of Environmental Summon and Successful Prosecution. 45

13.    FUTURE KEY ISSUES. 46

Key Issues for the Coming Month. 47

14.    CONCLUSIONS AND RECOMMENDATIONS. 49

Conclusions. 49

Recommendations. 50

 

lIST OF TABLES

 

Table I             Non-compliance (exceedance) Recorded for the Project in the Reporting Month

Table II            Summary Table for Complaints in the Reporting Month

Table III          Summary Table for Complaint Details in the Reporting Month

Table IV          Summary Table for Key Construction Work in the Reporting Month

Table V           Summary Table for Site Activities in the next Reporting Period

Table 2.1         Key Project Contacts

Table 2.2         Summary Table for Major Site Activities in the Reporting Month

Table 2.3         Construction Programme Showing the Inter-Relationship with Environmental Protection/Mitigation Measures

Table 2.4         Summary of the Status of Environmental Licences, Notification and Permits

Table 3.1         Locations for Air Quality Monitoring

Table 3.2         Air Quality Monitoring Equipment

Table 3.3         Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.4         Major Dust Source during Air Quality Monitoring

Table 4.1         Noise Monitoring Stations

Table 4.2         Noise Monitoring Equipment

Table 4.3         Noise Monitoring Parameters, Frequency and Duration

Table 4.4         Major Noise Source during Noise Monitoring

Table 4.5         Baseline Noise Level and Noise Limit Level for Monitoring Stations

Table 4.6         Baseline Noise Level and Noise Limit Level for Monitoring Stations (Evening-time & Daytime (Holiday))

Table 4.7         Baseline Noise Level and Noise Limit Level for Monitoring Stations (Night-time)

Table 5.1         Groundwater Quality Monitoring Stations

Table 5.2         Marine Water Quality Monitoring Stations

Table 5.3         Water Quality Monitoring Equipment

Table 5.4         Water Quality Monitoring Parameters and Frequency

Table 5.5         Methods for Laboratory Analysis for Water Samples

Table 5.6         Summary of Groundwater Quality Monitoring Results

Table 7.1         Cultural Heritage Monitoring Equipment

Table 7.2         AAA Levels for Monitoring for Cultural Heritage

Table 9.1         Landfill Gas Monitoring Equipment

Table 13.1       Summary Table for Site Activities in the next Reporting Period

 


lIST OF FIGUREs

 

Figure 1           Site Layout Plan

Figure 1a          Site Portions under Works Contract No. NE/2015/01 (Lam Tin Side)

Figure 1b         Site Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)

Figure 1c          Site Portions under Works Contract No. NE/2015/02

Figure 1d         Site Portions under Works Contract No. NE/2015/03

Figure 1e          Site Portions under Works Contract No. NE/2017/01

Figure 1f          Site Portions under Works Contract No. NE/2017/01

Figure 1g          Site Portions under Works Contract No. NE/2017/02

Figure 1h         Site Portions under Works Contract No. NE/2017/02

Figure 2         Locations of Air Quality Monitoring Stations

Figure 3         Locations of Construction Noise Monitoring Stations

Figure 4         Locations of Groundwater Quality Monitoring Stations

Figure 5         Locations of Marine Water Quality Monitoring Stations

Figure 6         Locations of Landfill Gas Monitoring

Figure 7         Location of Post-translocation Coral Monitoring

Figure 8         Location of Monitoring for Cultural Heritage

Figure 9         Location of Water Quality Monitoring in Temporary Embayment

 

 

 

lIST OF APPENDIces

 

Appendix A         Action and Limit Levels

Appendix B          Copies of Calibration Certificates

Appendix C          Weather Information

Appendix D         Environmental Monitoring Schedules

Appendix E          1-hour TSP Monitoring Results and Graphical Presentations

Appendix F           24-hour TSP Monitoring Results and Graphical Presentations

Appendix G         Noise Monitoring Results and Graphical Presentations

Appendix H       Groundwater Quality Monitoring Results, Graphical Presentations and Laboratory Testing Reports

Appendix I          Marine Water Quality Monitoring Results and Graphical Presentations

Appendix J            Quality Control Reports for Laboratory Analysis

Appendix K         Summary of Exceedance

Appendix L          Site Audit Summary

Appendix M        Event and Action Plans

Appendix N       Implementation Schedule And Recommended Mitigation Measures

Appendix O       Summaries of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution

Appendix P           Waste Generation in the Reporting Monthw

Appendix Q       Tentative Construction Programme

Appendix R        Record of Landfill Gas Monitoring by Contractor

Appendix S         Not Used

Appendix T        Cultural Heritage Monitoring Results

Appendix U       Piezometer Monitoring Results

Appendix V       Surface Run-off Management Plan