Environmental Monitoring Works
Key Information in the Reporting Month
Key Construction Work in the
reporting month & the next reporting month
Construction Activities undertaken during the Reporting
Month
Status of
Environmental Licences, Notification and Permits
Monitoring Parameters and
Frequency
Monitoring
Methodology and QA/QC Procedure
Monitoring
Parameters and Frequency
Sampling
Management and Supervision
Post-Translocation Coral Monitoring
Alert,
Alarm and Action Levels
Mitigation Measures for Cultural Heritage
8. LANDSCAPE
AND VISUAL IMPACT REQUIREMENTS
Monitoring
Parameters and Frequency
Implementation
Status of Environmental Mitigation Measures
12. ENVIRONMENTAL NON-CONFORMANCE
Summary of
Environmental Non-Compliance
Summary of
Environmental Complaint
Summary of
Environmental Summon and Successful Prosecution
Key Issues
for the Coming Month
14. CONCLUSIONS AND
RECOMMENDATIONS
lIST OF TABLES
Table I Non-compliance
(exceedance) Recorded for the Project in the Reporting Month
Table II Summary
Table for Complaints in the Reporting Month
Table III Summary
Table for Complaint Details in the Reporting Month
Table IV Summary
Table for Key Construction Work in the Reporting Month
Table V Summary
Table for Site Activities in the next Reporting Period
Table 2.1 Key
Project Contacts
Table 2.2 Summary
Table for Major Site Activities in the Reporting Month
Table 2.4 Summary
of the Status of
Environmental Licences, Notification and Permits
Table 3.1 Locations
for Air Quality Monitoring
Table 3.2 Air
Quality Monitoring Equipment
Table 3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 3.4 Major
Dust Source during Air Quality Monitoring
Table 4.1 Noise
Monitoring Stations
Table 4.2 Noise
Monitoring Equipment
Table 4.3 Noise
Monitoring Parameters, Frequency and Duration
Table 4.4 Major
Noise Source during Noise Monitoring
Table 4.5 Baseline
Noise Level and Noise Limit Level for Monitoring Stations
Table 4.7 Baseline
Noise Level and Noise Limit Level for Monitoring Stations (Night-time)
Table 5.1 Groundwater
Quality Monitoring Stations
Table 5.2 Marine
Water Quality Monitoring Stations
Table 5.3 Water
Quality Monitoring Equipment
Table 5.4 Water
Quality Monitoring Parameters and Frequency
Table 5.5 Methods
for Laboratory Analysis for Water Samples
Table 5.6 Summary
of Groundwater Quality Monitoring Results
Table 7.1 Cultural
Heritage Monitoring Equipment
Table 7.2 AAA
Levels for Monitoring for Cultural Heritage
Table 9.1 Landfill Gas Monitoring Equipment
Table 13.1 Summary
Table for Site Activities in the next Reporting Period
lIST OF FIGUREs
Figure
1a Site
Portions under Works Contract No. NE/2015/01 (Lam Tin Side)
Figure
1b Site
Portions under Works Contract No. NE/2015/01 (Tseung Kwan O Side)
Figure
1c Site
Portions under Works Contract No. NE/2015/02
Figure
1d Site
Portions under Works Contract No. NE/2015/03
Figure
1e Site
Portions under Works Contract No. NE/2017/01
Figure
1f Site
Portions under Works Contract No. NE/2017/01
Figure
1g Site
Portions under Works Contract No. NE/2017/02
Figure
1h Site
Portions under Works Contract No. NE/2017/02
Figure
2 Locations
of Air Quality Monitoring Stations
Figure
3 Locations
of Construction Noise Monitoring Stations
Figure
4 Locations
of Groundwater Quality
Monitoring Stations
Figure 5 Locations of Marine
Water Quality Monitoring Stations
Figure 6 Locations of Landfill
Gas Monitoring
Figure 7 Location
of Post-translocation Coral Monitoring
Figure 8 Location of Monitoring for Cultural Heritage
Figure 9 Location
of Water Quality Monitoring in Temporary Embayment
lIST OF APPENDIces
Appendix
A
Action and Limit Levels
Appendix
B
Copies of Calibration Certificates
Appendix
C
Weather Information
Appendix
D
Environmental
Monitoring Schedules
Appendix
E
1-hour TSP Monitoring Results and Graphical
Presentations
Appendix
F
24-hour TSP Monitoring Results and Graphical
Presentations
Appendix
G
Noise
Monitoring Results and Graphical Presentations
Appendix
H Groundwater Quality Monitoring Results,
Graphical Presentations and Laboratory Testing Reports
Appendix
I
Marine Water Quality Monitoring
Results and Graphical Presentations
Appendix J
Quality Control Reports for Laboratory
Analysis
Appendix K
Summary of Exceedance
Appendix L
Site Audit
Summary
Appendix M
Event and Action Plans
Appendix N
Implementation Schedule
And Recommended Mitigation Measures
Appendix O
Summaries of Environmental
Complaint, Warning, Summon and Notification of Successful Prosecution
Appendix P
Waste Generation in the Reporting Monthw
Appendix Q
Tentative
Construction Programme
Appendix R
Record of Landfill Gas
Monitoring by Contractor
Appendix S
Not Used
Appendix T
Cultural
Heritage Monitoring Results
Appendix U
Piezometer
Monitoring Results
Appendix V
Surface
Run-off Management Plan