Table of contents

 

EXECUTIVE SUMMARY.. 1

Introduction  1

Summary of Main Works Undertaken and Key Measures Implemented  1

Summary of Exceedances, Investigation and Follow-up  2

Complaint Handling, Prosecution and Public Engagement 2

Reporting Changes  2

Future Key Issues  3

1      INTRODUCTION.. 4

Background  4

Purpose of the Report 4

Project Organizations  4

Construction Activities undertaken during the Reporting Month  5

Summary of EM&A Requirements  6

Statues of Environmental Licensing and Permitting  6

2      AIR Quality.. 8

Monitoring Requirement 8

Monitoring Locations  8

Monitoring Parameters and Frequency  8

Monitoring Equipment 8

Monitoring Methodology  9

Results and Observations  11

Comparison of EM&A Result with EIA Prediction  12

3      noise.. 13

Monitoring Requirements  13

Monitoring Locations  13

Monitoring Parameters, Frequency and Duration  13

Monitoring Equipment 13

Monitoring Methodology and QA/QC Procedure  14

Maintenance and Calibration  14

Results and Observations  14

Comparison of EM&A Result with EIA Prediction  15

4      Ecology.. 16

Monitoring Requirements  16

Monitoring Locations  16

Monitoring Parameters, Frequency and Duration  17

Monitoring Methodology  17

Analytical Methodology  17

Results  18

Analysis  19

Observations  19

5      Water Quality.. 21

Monitoring Requirement 21

6      waste management.. 21

Monitoring Requirement 21

Waste Management Status  21

7      landscape and visual.. 22

Audit Requirement 22

8      environmental audit.. 23

Site Audits  23

Implementation Status of Environmental Mitigation Measures  23

Implementation Status of Event and Action Plans  25

9      Environmental non-conformance.. 26

Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution  26

Summary of Exceedance  26

10    future Key issues. 26

Monitoring Schedule  27

11    Conclusions and recommendations. 28

Conclusions  28

Recommendations  28

 

 

 

lIST OF TABLES

 

Table I             Summary Table for Major Site Activities in the Reporting Month

Table II           Summary of Complaint/Summons/Prosecution in the Reporting Month

Table III          Summary Table for Site Activities in the next Reporting Period

Table 1.1         Key Project Contacts

Table 1.2         Summary Table for Major Site Activities in the Reporting Month

Table 1.3         Summary of Environmental License and Permit

Table 2.1          Air Quality Monitoring Locations

Table 2.2         Frequency and Parameters of Air Quality Monitoring

Table 2.3          Air Quality Monitoring Equipment

Table 2.4          Major Dust Source during Air Quality Monitoring

Table 2.5          Comparison of 1-hr TSP Monitoring Data with Predictions in EIA Report (as    approved in 2013)

Table 2.6         Comparison of 24-hr TSP Monitoring Data with Predictions in EIA Report (as approved in 2013)

Table 3.1          Noise Monitoring Stations

Table 3.2          Frequency and Parameters of Noise Monitoring

Table 3.3         Noise Monitoring Equipment

Table 3.4          Other Noise Source during Noise Monitoring

Table 3.5          Baseline Noise Level and Noise Limit Level for Monitoring Stations

Table 3.6          Comparison of Noise Monitoring Data with Predictions in EIA Report (as approved in 2013)

Table 4.1          Monitoring of Measures to Minimise Disturbance to Waterbirds on Ng Tung, Sheung Yue and Shek Sheung Rivers during Pre-Construction Phase

Table 4.2          Ecological Monitoring Stations

Table 4.3          Representative Waterbirds

Table 4.4          Total Bird Species and Abundance in the Reporting Month

Table 4.5          Abundance of Representative Waterbirds in the Reporting Month

Table 4.6          T-test Result for All Waterbirds in the Reporting Month

Table 4.7          T-test Result for Representative Waterbirds in the Reporting Month

Table 4.8          Observations during Ecological Monitoring in the Reporting Month

Table 8.1         Observations and Recommendations of Site Audit of Contract No. DC/2018/06

Table 8.2          Observations and Recommendations of Site Audit of Contract No. DC/2018/07

Table 10.1        Summary Table for Site Activities in the Next Reporting Period

 

 

 

lIST OF FIGUREs

 

Figure 1.1        Layout Plan of the Project Site

Figure 1.2        Project Organisation for Environmental Monitoring and Audit

Figure 2           Locations of Air Quality Monitoring Stations

Figure 3           Locations of Construction Noise Monitoring Stations

Figure 4           Survey Location for Impact Ecological Monitoring

 

 

 

lIST OF APPENDIces

 

Appendix A    Action and Limit Levels

Appendix B    Environmental Monitoring Schedules

Appendix C    Copies of Calibration Certificates for Air Quality Monitoring

Appendix D    Weather Information

Appendix E    1-hour TSP Monitoring Results and Graphical Presentations

Appendix F     24-hour TSP Monitoring Results and Graphical Presentations

Appendix G    Copies of Calibration Certificates for Noise Monitoring

Appendix H    Noise Monitoring Results and Graphical Presentations

Appendix I     Ecological Monitoring Results and Analysis

Appendix J     Photo Records of Ecological Monitoring

Appendix K    Site Audit Summary

Appendix L    Waste Flow Table

Appendix M    Event and Action Plans

Appendix N    Environmental Mitigation Implementation Schedule (EMIS)

Appendix O    Summaries of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution

Appendix P     Summary of Exceedance

Appendix Q    Tentative Construction Programme